Specifics of the plant
- The project consists of 19 plantas independent solar plants of 96 nominal kW each.
- Every plant has three Fronius IG 400 inverters. And in total there are 6 transformers.
- There are 5 plants with Solterra modules and 5 plants with Trina Solar modules (all monocrsitalline). In total 6.150 photovoltaic modules are installed.
- Furthermore there are 9 plants with thin film modules of First Solar, with a total of 13.530 modules.
- The construction began in October 2007 and the plant was connected in September 2008.
- Every year this plant produces the energy for 1500 Spanish households and prevents the emission of 3500 tons of CO2.
- A monitoring system and frequent maintenance keep the plant performing at an optimum.
Images of construction
|